New Year Stainless Steel Sugarcane Crusher For Pressing Fresh Juice/Sugarcane Sugarcane Crusher Machine

1 Set
MOQ
New Year Stainless Steel Sugarcane Crusher For Pressing Fresh Juice/Sugarcane Sugarcane Crusher Machine
Features Gallery Product Description Request A Quote
Features
Specifications
Condition: New
Model Number: DN-80
Type: Cutter
Voltage: 220V
Power: 1.1kw
Weight: 60kg
Dimension(L*W*H): 490*410*800mm
Warranty: 1 Year
After-sales Service Provided: Engineers Available To Service Machinery Overseas
Certification: CE ISO
Name: Sugarcane Juicer Machine
Material:: Stainless Steel
Production Capacity: 300kg/h
Power: Plug-in Or Battery
Juice Yield: 98%
Basic Infomation
Certification: CE ISO
Model Number: DN-80
Payment & Shipping Terms
Packaging Details: Wooden Case Packing accord with export standard. After inspection by the quality control department, passing inspection, the machine comprehensive clean-up, and then start packing. First desiccant is placed in the machine And then around the machine with 6
Supply Ability: 1000 Set/Sets per Week
Product Description

New year sugarcane crusher to press fresh sugarcane juice/sugar cane grinder machine

Product Description

                             

The characteristic:

1.stainless steel shell, mirror finish.
2.transmission part and juicing part are seperated, avoid polluting food.
3.whole steel gear(45#), no break, long service time.
4.turbo box transmission, very quiet.
5.three stainless steel rollers, deep press, juice and cane residue seperated automaticlly.
6.four wheel, easy to move
7.three buttons,  STOP, FORWARD, RETREAT, easy to operate Also the cool appearance.

 

 

 

Picture for New year sugarcane crusher to press fresh sugarcane juice/sugar cane grinder machine

  

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Packaging & Shipping

 

Wooden Case Packing accord with export standard. After inspection by the quality control department, passing inspection, the machine comprehensive clean-up, and then start packing. First desiccant is placed in the machine And then around the machine with 6 cm thick foam board, winding stretch film for reinforcement, and then add the bubble film. Machine packed in wooden case, and then the metal strip reinforcement. Product packed in containers, depending on the product to be reinforced.

 

 

Our Services

 

we are sure to supply overseas installation. Generally, whole production line installation will need about 7 days. And the customer should charge for the visa,the air tickets,the accommodation and the salary.

About our product warranty time:24 months free of charge.

 

 

 

 

Company Information

 

Shijiazhuang Daina Machinery Co.,Ltd specially produce bakery machine for 20 years,we

specialize in supplying a wide range of Bakery equipments.We dedicate to cooperating with bread

manufacturers and provide with various services such as design consultation,equipment

supplying,technician installation and outstanding after sales service.

 

Our main products are baking ovens(rotary ovens,convection ovens,deck ovens,pizza ovens,

tunnel ovens,pizza conveyor ovens),dough spiral mixers,proofer rooms,planetary mixers,dough

dividers and bread moulders,ice cream machine, fried ice cream machine,snack machines which all applied ISO9001 and

CE certificates.  

 

Daina Machinery company has a strong technical team.We keep in step with technologies of

internationally advanced food machinery.We have best quality and best after-sales service. We never only sell machines. We help customers use our machines to

produce best products.

With our fully experienced senior management team,we provide our customers with

professional and satisfying service.

 

 

Daina! Your best choice!

Welcome to visit our website!

  

 

 

 

 

FAQ

 

1. What is the MOQ of the bakery machinery?

   1 set.

2. what is the grantee period?

  The ordinary type is 12 months, and the luxury type is 24 months, and if any components damaged

  in grantee period, we will send same free components by air and will guide for installation.

3. Do you supply overseas installation? How many days you need?And what about the charge?

   Yes, we are sure to supply overseas installation. Generally, whole production line installation will

   need  about 7 days. And the customer should charge for the visa, the air tickets, the 

  accommodation and the salary.

4. What about the packing?

   After finishing the production, we will clean and packed it before it is qualified by the QC manager. 

   First we will put drying desiccant inside the machine (protect the machine from wet damage 

   during the transportation), then put 6mm cystosepiment outside it and upgrade the thermal 

   contracting film.

   Finally we will put wooden case and steel belt. We will upgrade again according to different

   machine to protect the damage of the machine before loading the container.

 

 

 

 

 

Recommended Products
Get in touch with us
Contact Person : YAfeng LIU
Characters Remaining(20/3000)